Fujian Dongshan Ecological Island Highway S1 section

Fujian Dongshan Ecological Island Highway S1 section

 

2015--2016

Projects with a total mileage of 14.21 km, including: the main line for the first grade highway, 6.06 km long, mountain Su Tie Line for secondary roads, 805 km.

The main line road grade is a road and urban road function, some sections of the old road widening project, the construction period is tight, difficult.