Qi Yang Expressway Shuang'gou interworking connection line e

Qi Yang Expressway Shuang'gou interworking connection line engineering GYHQ

2015-2017

Total length of the bridge 213M, the total area of 11184m2 bridge, the bridge for the separation of the two bridge layout. The block wall type pier pier, abutment for gravity abutment, Taiwan slope, the vehicle load grade: a highway bridge.