Fujian Xia Pudong rushed to the train station A6

Fujian Xia Pudong rushed to the train station A6

2015--2018

The total mileage of the project is 6.39 kilometers. The bridge 3 bridges, culverts 18, 2 at the intersection.

Line 90% after beach, shrimp ponds, ditches, the lack of sidewalks, soft foundation operation narrow, pre pressing period is long, slope height, close to the county road, difficult construction, organizational difficulties, safety protection.